Project Features And Development Parameters
  • South & South East Asia’s Largest Integrated Development
  • Convention centre with a total seating capacity of 11000 pax, having plenary hall, Ball room and multiple conference rooms.
  • Asia’s one of Largest Exhibition & Convention Centre
  • Plenary hall having retractable & removable seating arrangement in multiple configuration with total capacity of 6000pax.
  • 221 Acres of Integrated Development Over 11 Million sqft Built-up Area
  • Ball room with total capacity of 2400pax, divisible in multiple sections.
  • 100 International & National Events in a year
  • Thirteen conference rooms at different levels in convention centre ranging from 68 to 860 capacity with total 2600pax
  • Directly Connected through Dwarka Expressway & UER-II
  • Exhibition Halls spanning from 72m clear span and 200m length with facility to divide in multiple sections
  • Next to upcoming Diplomatic Enclave & Inter State Bus Terminus
  • Open Exhibition areas for Large exhibits & MSME Exhibitions facilities
  • Mixed Use Development comprising Hotels, Grade–A offices & High end Retail facilities
  • India’s First retractable roofing all Season Multipurpose Arena
  • Dedicated Metro Station within the Campus
  • Underground combined Utility Tunnel housing multiple infrastructure services.
  • Total underground carparking facility 28,000
  • Smart development – Integration of Entire Campus with SCADA
  • Estimated Project Cost over Rs. 25,000 Cr. (USD 4 Billion)
  • Open Exhibition Area 538,000sqft for Heavy & MSME Exhibits
  • Development proposed in EPC & PPP model to be completed in 2 Phases.
  • 3 Five star Hotels, 3 Four star Hotels, 2 Three star Hotels and serviced apartments. Total 3500 room keys.
  • Completion of Phase 1 by July 2023.
  • 4.5 Million sqft Office & Retail Development
  • Convention Centre with Built-up Area 645,000sqft & Seating capacity of 11,000 person.
  • Multi-purpose Arena Built-up Area 538,000sqft & 20,000+ Seating Capacity
  • 5 Exhibition Halls of Built-up Area 3,230,000sqft connected with 1km long Grand Foyer.
  • Phase 1 Development consist of one Convention Centre, two Exhibition Halls with associated Foyer, open Exhibition, Trunk Infrastructure for Entire Project
Development Statistics
Sustainability & Environmental Sensitivity
  • Indian Green Building Campus (IGBC) Platinum Certification for Entire Campus
  • Iconic & Sustainable Architecture Design
  • More than 20% Energy Saving by Green Building Design
  • Renewable Energy - Roof Top Solar Photovoltaic Panel for 5% solar Energy Generation of connected load.
  • Rain water Harvesting System for the Entire Campus
  • Pneumatic Solid Waste Management for Entire Campus
  • District Cooling (Central Air Conditioning) for the Entire Campus
  • 40% dedicated Green & Open Spaces
  • Emission free Transportation Modes
  • Recycling & Re-use of Water
img
State of the Art sustainability approach to planning and implementation have been included in the YashoBhoomi project. Our approach incorporated sustainable planning and design solutions and techniques in transportation, alternative energy production and energy conservation, water resource management, land use planning and building design to create cost-effective and measurable solutions.
News & Updates
img
This is the official website of India International Convention & Exhibition Centre (IICC) Limited a Govt. of India Enterprise under Department of Promotion of Industry and Internal Trade, Ministry of Commerce & Industry. Copyright © 2024 https://iiccl.dpiit.gov.in/ All rights reserved.
Web design by: